TB and SGCs joint meetings
9th meeting on December 16, 2009 (KEK/WebEx)
Agenda (pdf)
Reviews
Proposals
Minutes and Summary
8th meeting on June 11, 2009 (KEK/WebEx)
Agenda (pdf)
Reviews
Opening address (J. Urakawa) (pdf)
Hardware status 1: (N. Terunuma) (pdf)
Hardware status 2: (A. Aryshev) (pdf)
Emittance study (K. Kubo) (pdf)
ATF2 commossioning (T. Okugi) (pdf)
Proposals
1: Multi OTR system in ATF2 (C. Alabau)
(application form)
(description)
(presentation)
2: OTR and SR Monitor at EXT (T. Mitsuhashi)
(application form1)
(form2)
(description1)
(description2)
(presentation)
3: Cavity beam orbit tilt monitor (D. Okamoto)
(application form)
(description)
(presentation)
4: Hydrostatic Levelling System at ATF2 (M. Masuzawa)
(application form)
(description)
(presentation)
Minutes and Summary
Closing Remarks (A. Wolski) (pdf)
Summary Report (pdf)
7th meeting on December 18, 2008 (at KEK)
Agenda (pdf)
Reviews
Opening address (Junji Urakawa) (pdf)
Report of 7th ATF2 project meeting. (A. Seryi) (pdf)
Laser Wire (S.Boogert) (pdf)
Fast Kicker R&D (T.Naito) (pdf)
FONT (P.Burrows) (pdf)
Cold BPM (H.Hayano) (pdf)
Report of hardware status from May 2008 (N. Terunuma) (pdf)
Compton (T.Takahashi) (pdf)
Proposals
1: SC-FD (pdf)
2: Permanent magnet for ATF2 FD (Iwashita) (pdf)
3: Streightness monitor at ATF2 (pdf)
4: Background studies (pdf)
Minutes and Summary
Summary Report (pdf)
6th meeting on June 11 and 12, 2008 (by WebEx)
Call for new proposals (Junji Urakawa) (pdf)
Agenda (pdf)
Reviews
Opening address (Junji Urakawa) (pdf)
DR BPM upgrade (M. Wendt) (pdf)
Fast Kicker (T. Naito) (pdf)
Ext. line Laser Wire (S. Boogert) (pdf)
FONT (P. Burrows) (pdf)
Emittance studies at EXT (P. Bambade) (pdf)
Emittance studies at DR (A. Wolski) (pdf)
Other R&Ds (N. Terunuma) (pdf)
ATF2: Installation status (N. Terunuma) (pdf)
ATF2: Topics at the project meeting etc. (A. Seryi) (pdf)
Proposals
Exploring ultra-low beta* values in ATF2 (R. Tomas) (pdf)
EFuture laser facility at ATF2 (T. Tajima) (pdf)
Minutes and Summary
Summary Report (pdf)
5th meeting on December 21, 2007 (KEK)
Agenda (Junji Urakawa) (ppt)
Reviews
Progress on the R&D programs (Nobuhiro Terunuma) (pdf)
Following two were presented in ATF2 meeting or DR workshop. SKIPPED.
Beam extraction by Fast kicker (Takashi Naito) (pdf)
Status of ATF2 project (Toshiaki Tauchi) (pdf)
Proposals
Integration of OTR and ODR techniques into the LW system (Pavel Karataev) (pdf)
Minutes and Summary
Summary Report
(pdf)
4th meeting on May 28-29, 2007 (CI, Daresbury)
Wellcome address (Andy Wolsky) (ppt)
Opening address (Junji Urakawa) (ppt)
Review of Hardware and Instrumention R&D at ATF Jan-May, 2007
Plan of beam extraction by using strip-line kicker with pulse bump orbit (Takashi Naito)
(ppt)
Laser wire R&D progress (Stewart Boogert)
(ppt)
FONT R&D progress (Glenn Christian)
(ppt)
X-SR and CSR R&D (Nobuhiro Terunuma)
(ppt)
IP Cavity BPM (Yosuke Honda)
(pdf)
Status of ATF2 project (Toshiaki Tauchi)
(pdf)
Optics, task force on extraction line emittance growth, remote participation and SLAC-status (Andrei Seryi)
(ppt)
Status of ATF DR BPM upgrade (Janice Nelson)
(ppt)
Plan and preliminary results for fast ion instability study (Junji Urakawa)
(ppt)
Proposals
MONALISA in ATF (David Urner)
(ppt)
ILC LC-BEAM-3 Collimator Damage Test (Nigel Watson)
(ppt)
Discussions
Comments on the ATF radiation safety (Nobuhiro Terunuma)
(ppt)
Comments on the Remote Participation (Nobuhiro Terunuma)
(ppt)
Minutes and Summary
Summary Report
(pdf)
3rd meeting on December 20, 2006 (KEK)
Agenda by J.Urakawa (ppt)
R&D report for Fast kicker, XSR, FONT and others by N.Terunuma (pdf)
R&D report for LW@EXT by S.Boogert (pdf)
R&D report for Nano-BPM by S.Boogert (pdf)
R&D report for ODR and CSR by P.Karataev (ppt)
Status of ATF2 project by T.Tauchi (pdf)
Proposal
Fast Ion Instability by E.Eckhard (pdf)
Minuites and Discussion summary
Minutes (pdf)
Summary Report (pdf)
2nd meeting on May 28-29, 2006 (KEK)
Minutes: 2006-May-28
(MSW)
Minutes: 2006-May-29
(MSW)
Technical Board Discussion Summary
(MSW)
Agenda by J.Urakawa
(PPT)
Comments by J.Urakawa
(PDF)
Review of Hardware and Instrumentation R&Ds by N.Terunuma
(PPT)
Status of ATF2 project by T.Tauchi
(PDF)
ATF2 layout for discussion of Laserwire
(PDF)
Proposals
Fast Kicker by T.Naito
(presentation,PPT)
(details,PDF)
Investigation of focussing characteristic of concave ODR target by P.Karataev
(presentation,PPT)
(details,PDF)
Study of high intensity multi-bunch gamma ray generation by Compton scattering by T.Omori
(presentation,PDF,
PPT)
(details,PDF)
Study of beam handling by crystal channeling at ATF by T.Takahashi
(presentation,PPT)
(details,PDF)
1st meeting on December 13, 2005 (KEK)
Minutes of the 1st TB & SGC joint meeting
(PDF)
Agenda for 1st TB & SGC joint meeting, J.Urakawa
(PDF)
Review of Hardware and Instrumentation R&D's, N.Terunuma
(PDF)
Review of beam dynamics R&D's, M.Kuriki
(PDF)
Short report on new proposals, T.Okugi
(PDF)
Status of ATF2, T.Tauchi
(PDF)
Report on ATF2 proposal, Vol.2, T.Sanuki
(PDF)
ATF operation group, S.Kuroda
(PDF)
|